Diversion tunnels have been completed to redirect the Peace River during low water this summer, in one of the most critical steps to completing the Site C dam, March 2020. (BC Hydro)

Open letter urges B.C. to pause work at Site C dam to review costs, geotechnical issues

Dam has been affected by possible COVID-19 delays

A letter addressed to NDP Leader John Horgan is urging the province to halt the construction of the Site C dam while geotechnical issues are investigated.

The open letter, which includes signatories such as former BC Hydro CEO Marc Eliesen, Chief Roland Willson of the West Moberly First Nations and 16 other former CEOs, scientists and Indigenous leaders, says that the “problem-plagued” project needs to stop construction.

“The Site C project is years away from completion, is mired in problems that may be unfixable, and confronts new, potentially horrendous cost over-runs,” the letter states.

The letter cites geotechnical problems revealed in July, when BC Hydro CEO Chris O’Riley wrote of “a project risk” to do with the right bank. O’Riley said that “investigations and analysis of geological mapping and monitoring activities completed during construction identified that some foundation enhancements would be required to increase the stability below the powerhouse, spillway and future dam core areas.”

The CEO’s letter also cited financial hurdles brought about by the COVID-19 pandemic. Prior to the worldwide health crisis, the first generating unit of the Peace River dam was scheduled to go into service in late 2023, with a final in-service date in 2024.

“While we remain on schedule to achieve river diversion in 2020, there is uncertainty with the project’s schedule and in-service date. This is primarily due to our ability to re-start and accelerate work that was halted due to the pandemic,” O’Riley wrote in July.

Monday’s (Sept. 28) open letter asks the government to “immediately suspend all construction activities at the project” while giving Site C special advisor Peter Milburn, a former B.C. government bureaucrat with a background in civil engineering, time to accomplish three tasks.

The open letter’s signatories want Milburn to appoint a panel of three professionals with no link to Site C to do geotechnical assessment. Secondly, the letter asks for that information to be public prior to the government making a decision to restart the project.

“This is crucial because to date the public’s trust in the Site C project has been eroded by a lack of transparency,” the letter states. The last ask is for the public to get a “full accounting” of the costs to date associated with Site C, as well as of the upcoming costs required to complete the project.

The cost of the Site C Dam was pegged at $7.9 billion in 2011 but has grown to $10.7 billion. The dam has also been the subject of legal battles, with the Prophet River First Nation settling one in early August.

READ MORE: Agreement between province, BC Hydro, First Nation, ends legal fight over Site C

READ MORE: BC Hydro’s Site C set back by COVID-19, foundation changes


@katslepian

katya.slepian@bpdigital.ca

Like us on Facebook and follow us on Twitter.

Want to support local journalism during the pandemic? Make a donation here.

CoronavirusIndigenousSite C

Get local stories you won't find anywhere else right to your inbox.
Sign up here

Just Posted

Troy McMillan was flown to a Vancouver hospital Oct. 18 after falling into the boards while playing hockey Oct. 11. (Submitted Photo)
Quesnel family “overwhelmed” by support after hockey injury

Troy McMillan is fighting for his life after tumbling into the boards Oct. 11

Current students from Quesnel Junior School help break the ground at the construction site of the new Junior School. The project has been in development since 2005, and it is expected to be completed in 2022. (Cassidy Dankochik Photo - Quesnel Cariboo Observer)
Quesnel School District “COVID-free”

Superintendent Sue-Ellen Miller is happy with how two September exposure events were handled

This Google Maps screenshot shows the Highway 97 intersection at Juniper Road that is being deactivated in South Quesnel. (Google Maps screenshot)
Juniper Road intersection being deactivated in South Quesnel

Traffic can no longer enter or exit Highway 97 at Juniper Road in a move to improve road safety

Quesnel was hit with unseasonably October snowfall earlier this week. More is on the way on Sunday, Oct. 25 and Monday, Oct. 26, and Quesnel and North Cariboo are under a winter storm warning. (Cassidy Dankochik Photo - Quesnel Cariboo Observer)
UPDATE: Winter storm warning ends for Quesnel

10-20 cm of snow and freezing rain was expected to start Sunday night

FILE – Provincial Health Officer Dr. Bonnie Henry provides the latest update on the COVID-19 pandemic in the province during a press conference in the press theatre at Legislature in Victoria, B.C., on Thursday, October 22, 2020. THE CANADIAN PRESS/Chad Hipolito
B.C. shatters COVID-19 records with 817 weekend cases; masks now expected indoors

Three people have died over the past three reporting periods

RCMP have released more details regarding what led up to an arrest caught on video in Williams Lake Sunday, Oct. 26. (Facebook video screenshot)
Review launched after ‘high-risk, multi-jurisdictional’ chase, arrest in Williams Lake

RCMP launching a full review and code of conduct investigation

(Pxfuel)
B.C. limits events in private homes to household, plus ‘safe six’ amid COVID-19 surge

Henry issued a public health order limiting private gatherings to one household, plus a group of ‘safe six’ only

B.C. Liberal Leader Andrew Wilkinson speaks during a drive-in car rally campaign stop at a tour bus operator, in Delta, Saturday, Oct. 17, 2020. THE CANADIAN PRESS/Darryl Dyck
Andrew Wilkinson stepping down as B.C. Liberal leader

Will stay on until the next party leader is chosen

Join Black Press Media and Do Some Good

Pay it Forward program supports local businesses in their community giving

VicPD and B.C. Conservation Officer Service teamed up to free two bucks who were entangled in a fishing net and dragging a wheelbarrow sized piece of driftwood behind them. (VicPD)
VIDEO: Police, B.C. Conservation help two bucks caught in one fishing net

Bucks were also dragging a wheelbarrow sized piece of driftwood behind them

“We have to make a call out to address this now so our people don’t have to feel fearful,” said Tribal Chief Mina Holmes. (Carrier Sekani Tribal Council Facebook photo)
Carrier Sekani Tribal Council seeks Indigenous-led task force in northern B.C. hospitals

Request made in an open letter to federal minister Carolyn Bennett

A heavy police presence was spotted in Lumby, Monday, Oct. 26, 2020. (Facebook)
Police situation leads to ‘hold and secure’ at North Okanagan school

Police call for social media blackout in ongoing incident

Most Read